COLOR STEEL MACHINE — PROJECT ENQUIRY CHECKLIST Planning aid only. Leave unknown items marked UNKNOWN. Company / country: Contact name / email: Operation to automate: Existing line or new installation: Incoming material and finished workpiece: Drawing reference and revision: Material grade / density / gauge / thickness: Minimum and maximum dimensions: Individual workpiece weight: Current output / required output / operating hours: Incoming orientation / receiving orientation: Pickup and discharge heights: Available floor space and loading access: Available voltage / frequency / phases / air supply: FEEDING: stack arrangement, strip format, receiving pattern, surface condition. STACKING: section drawing, turnover sequence, layers, stack removal. WELDING: assembly and joint drawings, weld and inspection requirements. CUTTING + WELDING: incoming stock condition, required process boundary. Scope: tooling / conveyors / controls / protection / installation / training. Required manuals / electrical documents / spare parts: Required conformity documents and model coverage: Acceptance samples, run conditions and measurement method: Preferred schedule: Open questions / unknown inputs: COMPARABLE BID SCHEDULE — mark INCLUDED / OPTIONAL / EXCLUDED / UNKNOWN Machine and tooling configuration: Incoming conveyors and completed-bundle transfer: Retained / modified / new equipment register: Integration work and responsible supplier: Recipe changes / manual adjustments / extra tooling: Packing / transport / installation / training / documentation / spares: OUTPUT EVIDENCE Workpiece and sample identifiers: Pieces per cycle and timing start/end: Simulated / demonstration / production-run result: Replenishment and stack-removal time included or excluded: Recorded interruptions and product-change sequence: Reviewed 13 September 2026. Supporting references and scope explanations: https://colorsteelmachine.com/resources/automation-rfq-checklist/ Email authorised drawings and video to tony.buy@gmail.com. The website enquiry form accepts text, not file attachments. Final specifications and obligations require written confirmation.