EXISTING-LINE PROJECT INPUT SHEET Color Steel Machine | Revision 2026-09-13 https://colorsteelmachine.com/resources/downloads/ Planning inputs only. Do not use as an inspection or engineering approval. Complete from existing records and authorised drawings. Mark unknowns TBD. PROJECT Company / country: Contact / project reference: New installation or existing-line addition: Process to automate: Existing equipment maker / model / documentation revision: PRODUCT MATRIX (repeat for each product family) Material and surface condition: Drawing identifier / revision: Length / width / thickness or profile / units: Workpiece mass / source of mass value: Orientation at entry and required orientation at exit: Shortest / longest / most frequent product: Sensitive contact surfaces or protective film: Material sample availability: PROCESS AND TIMING Recorded line speed / units / operating conditions: Observed piece arrival interval / units / conditions: Pieces handled per cycle: Timed sequence start / finish: Target output / counting unit / time period: Replenishment and finished-stack removal arrangements: Product change frequency and current changeover steps: LAYOUT AND INTERFACES Authorised layout file / revision / units: Existing drawing reference for transfer positions and heights: Available installation area from layout: Material entry / exit directions: Existing controls documentation and integration contact: Equipment to retain / modify / supply new: Who owns each interface and who must confirm it: STACK REQUIREMENTS (if relevant) Pieces per layer / layers per stack: Orientation / spacing / separators: Stack transfer and packaging handoff: ATTACHMENTS AND OPEN QUESTIONS Drawings / recorded production video / product list: Unknown values and person responsible for confirmation: Read: https://colorsteelmachine.com/resources/feeder-stacker-retrofit-checklist/ Send an enquiry: https://colorsteelmachine.com/contact/ The web form has no attachment upload. Email authorised files to tony.buy@gmail.com.