AUTOMATION QUOTATION COMPARISON WORKSHEET Color Steel Machine | Revision 2026-09-13 https://colorsteelmachine.com/resources/downloads/ Buyer preparation aid, not a contract or supplier commitment. Use the same product list and layout revision for every supplier. Status choices: Included / Optional / Excluded / Awaiting confirmation. PROJECT BASELINE Project reference: Workpiece list and drawing revisions: Layout revision: Target process and output definition: SUPPLIER RESPONSE (copy for each supplier) Supplier / quotation reference / date / revision: Proposed machine and tooling configuration: SCOPE ITEM | STATUS | QUOTATION REFERENCE | OPEN QUESTION Machine and tooling: Incoming conveyor or supports: Stack removal and downstream transfer: Product changeover functions: Existing-line mechanical interfaces: Controls integration: Packing and transport: Installation and training: Documentation and parts list: Options and exclusions: OUTPUT CLAIM RECORD Workpiece reference and dimensions: Pieces per cycle and counting unit: Timed sequence start / finish: Replenishment / stack removal included or excluded: Simulation, demonstration or recorded production: Interruptions and test duration stated by supplier: Evidence file / date / unresolved assumptions: COMMERCIAL INFORMATION AS QUOTED (do not infer missing terms) Currency / quoted price / quote validity: Taxes, freight and installation included or excluded: Quoted delivery timing and stated dependencies: Questions requiring written supplier confirmation: Read: https://colorsteelmachine.com/resources/automation-rfq-checklist/ Discuss your project: https://colorsteelmachine.com/contact/