AUTOMATED WELDING — EVIDENCE PREPARATION SHEET Purpose: organise documents and responsibility BEFORE an acceptance protocol is agreed. NOT an acceptance standard, inspection instruction, safety test or release authority. No pass limits, default test duration or approvals are supplied. Project / machine identification: Ordered configuration / quotation reference: Tooling and programme references: Selected power-source package and confirmation reference: Approved assembly / component / weld drawing revisions: Procedure reference and relevant scope where applicable: Person responsible for procedure suitability: Person responsible for agreeing quality evidence: Project criteria / evidence document references: Representative samples and drawing revisions: Ordered variants not represented by samples: Machine demonstration scope to be agreed: Counting / timing boundaries to be agreed: Loading / preparation / unloading assumptions: Evidence still needed and its responsible reviewer: Machine manuals / drawings / parts list: Training and handover documentation references: Outstanding action / owner / evidence needed / due date: Remaining site tasks: Use separate approved protocols and reports for testing, evaluation and sign-off.