F01
Gantry-Type Rock Wool Continuation Machine
Material dimensions, incoming presentation and receiving orientation.

Contact our team
Tell us what you make and the step you want to automate. Talk to Tony about feeding, stacking and welding equipment matched to your line.
Discuss your projectRock wool feeding · Equipment visualization
Submit your project inquiry here to email Tony, your contact for equipment selection and quotations.
For drawings or videos, email Tony directly or send them through WhatsApp or WeChat.
Optional preparation · keep actual values together
Start with the information you have. Keep units and drawing revisions with your values; mark unknowns as TBD. These preparation routes help a configuration discussion, not machine selection approval or a promised quotation.
Use the machine/process field above. If unsure, choose “Not sure — review my line” and describe the step you want to automate.
Include workpiece dimensions and weight, incoming and requested finished orientation, output requirements and line handover. Distinguish observed timing from target output.
Keep your own copy of drawings and completed sheets. Enter a short summary in the web form; send authorised files through the existing email or messaging contacts.
Use the general enquiry form, then add the relevant process inputs below. Blank PDF forms and TXT sheets collect your project information; the S04 product brochure describes only that model.
F01
Material dimensions, incoming presentation and receiving orientation.
F02
Material presentation, picking location and receiving-line interface.
F03
Core-board or panel material, incoming arrangement and receiving orientation.
S01 and S04 are separate machines. Do not transfer vacuum pickup descriptions or brochure limits between them.
S01
Panel variants, incoming face, bundle pattern and downstream handover.
S04
Panel drawings and surface condition, incoming face, requested turnover and stack handover. Use the named-model brochure as reference, not as a blank project form.
Use the relevant section of the shared profile input sheet; keep the actual C/Z or floor deck drawing and orientation requirements.
S02
Profile drawing revision, incoming direction, finished bundle orientation and handover.
S03
Profile drawing, total and effective width, incoming and finished face, and full-stack handover.
W01
Cleat and purlin drawings, fixture references and required weld scope.
W02
Tie-rod drawings and integrated cutting-and-welding versus welding-only scope.
Record what is available, including units, drawing revision and the source of observed values. Mark missing items as TBD rather than guessing. Required web-form fields still need to be completed; equipment configuration remains subject to review.
No. This form accepts a written project summary, not attachments. Send authorised drawings or videos separately using the email or messaging contacts above. Downloading or filling a preparation sheet does not send it to CSM.
No. They collect project information. Brochures belong to their named models; final configuration, operating instructions and any acceptance requirements must match the confirmed equipment and application.